Elite Aviation Manufacturing Co., Ltd sales@eliteaviationcoil.com 0086-373-3099288
Product Details
Certification: ISO, RoHS
Payment & Shipping Terms
Model NO.: |
EA-M3 |
Rotation Direction: |
Right Rotation |
Surface Finishing: |
Polishing |
Customized: |
Customized |
Standard: |
Metric, Unc, Unf |
Dye Color: |
Primary Color, Red, Green, Blue,Customer Designed |
Use: |
Increase Thread Strength |
Sample: |
Available |
Service: |
24 Hours Online |
Mininum Order Quantity: |
100PCS |
Transport Package: |
Inner Plastic Bags+Outside Carton Cases |
Specification: |
M3X2D |
Trademark: |
EA |
Origin: |
Henan Of China |
HS Code: |
73181900 |
Production Capacity: |
10000000PCS/Month |
Model NO.: |
EA-M3 |
Rotation Direction: |
Right Rotation |
Surface Finishing: |
Polishing |
Customized: |
Customized |
Standard: |
Metric, Unc, Unf |
Dye Color: |
Primary Color, Red, Green, Blue,Customer Designed |
Use: |
Increase Thread Strength |
Sample: |
Available |
Service: |
24 Hours Online |
Mininum Order Quantity: |
100PCS |
Transport Package: |
Inner Plastic Bags+Outside Carton Cases |
Specification: |
M3X2D |
Trademark: |
EA |
Origin: |
Henan Of China |
HS Code: |
73181900 |
Production Capacity: |
10000000PCS/Month |
Product name | Tangless Wire Thread Insert for Thread Repair | |
Brand Name | EA | |
Material | Stainless steel 304,Customer designed | |
Surface treatment | Stainless steel surface; Environmental protection plating color : green,red ,bule,yellow,other; Galvanized; Cadmium plated; Silver plated Tin plated; Dry film lubrication treatment; According to customer requirements | |
Products number | Metric size | M1.4~M60 |
Inch size | 1-64~11/2"-6 | |
4-48~11/2"-12 | ||
Standard type | MS21209/Din8140/other | |
Threaded size | Metric,Inc UNC, UNF | |
Length | 1D,1.5D,2D,2.5D,3D | |
Certificate | ISO 9001:2015; SGS;ROSH | |
Function | Connection,Fastening and assemble | |
Reliability test | Mechanical test, hardness test. Salt spray endurance test | |
Range of application | Electronic computers, plastic products, cabinet, Sheet metal, mot | |
Delivery time | Usually within 3-5 days if we have materials in stock. |